Anhui ag体育 and ag体育 Career Academy fire fighting linkage system maintenance service procurement project (second time) - Anhui ag体育 and ag体育 Career Academy

ag体育

Welcome to Anhui ag体育 and ag体育 Career Academy.

Old version review Set as home page Join in collection Contact us

Current location: ag体育 Homepage " News Center " Tender notice The main text

News Center

    Anhui ag体育 and ag体育 Career Academy fire fighting linkage system maintenance service procurement project (second time)

    Edit date: 2020-06-30 editor: Readings: second


    Anhui ag体育 and ag体育 Career Academy Fire fighting linkage system maintenance service procurement Enquiry procurement is conducted. Suppliers who meet the qualification requirements are welcome to respond to quotations.

    I. project situation

    (a) list of fire fighting linkage systems:

    1. the main power cable of the fire alarm main engine is short circuited. The main engine can not be sent. The original cable is embedded in the casing. It needs to be re released from the monitoring room power to the fire alarm main engine (installed on the ground and connected to the alarm main station by a small bridge rack).

    2. fire alarm mainframe, fire equipment power monitoring host, electrical fire alarm host battery damage, need to be replaced;

    3. as the ground is humid, the fire fighting linkage is connected to the ground, which is easy to conduct electricity and needs isolation measures.

    4. when the roof exhaust fan is started, it is necessary to replace the power switch in the fan control cabinet.

    5. a new experimental building, a fire shutter door control box, two layers of fire shutter door control box, three fire shutter door control box failure, need to replace the fire shutter door control box;

    6. new laboratory building two floor fire shutter door double power control switch failure, need to replace double power transfer switch;

    7. the dual loop boards of the fire control linkage of the gatekeeper were damaged due to lightning stroke in June 15th and need to be replaced.

    (two) list of materials:

    Serial number

    Name

    Requirement (model)

    Number

    One

    Power switch for roof fan control cabinet

    4P 63A switch

    2 sets

    Two

    Fire shutter door control cabinet (double power supply)

    FJK-SF-XA01 Dual power supply

    3 sets

    Three

    Dual power transfer switch

    AC400V 50Hz 32A

    1 sets

    Four

    Laying of power line for fire engine (including bridge frame)

     

    One

    Five

    Fire alarm main battery (two groups, 4 small batteries)

    Yi AI electric fire, love power monitoring host battery

    2 group

    Six

    Firefighting equipment power monitoring host, electrical alarm host battery (two sets of 4 small batteries)

    Yi AI electric fire, love power monitoring host battery

    2 group

    Seven

    Gatekeeper fire linkage main engine double circuit board

     

    1 pieces

     

    (three) controlled price: 7000 yuan  

    Two. Supplier qualification

    1, comply with the twenty-second provision of the government procurement law of the People's Republic of China;

    2. The industry qualification certificate has the qualification of fire service, and the business license contains the content of the subject.

    3. The project does not accept joint tender.

    Copies of the above materials are required and the company seal is affixed.

    Three. Notes for inquiry

    (1) the deposit is required for this project.

    1, RMB: 1000 yuan.

    2. Only accept telegraphic transfer and transfer method (transfer account is consistent with the name of bidder), other ways are invalid; telegraphic transfer or transfer must ensure payment before the deadline.

    3. Tender margin account:

    Account bank: Chizhou branch of the Industrial Bank

    Payee: Anhui ag体育 and ag体育 Career Academy

    account   Number: 131608310920000417

    Remarks: Fire Maintenance Margin

    2. Suppliers who are interested in this project are requested to make a one-time written quotation to Anhui ag体育 and ag体育 Career Academy before the deadline specified in this inquiry letter. Only one price is allowed for this enquiry, and no more quotations will be accepted. The letter of quotation and relevant documents are sealed after the seal of the unit is sealed and submitted to the unit.

    3, the quotation letter is sealed, and the seal is stamped with a seal. The seal should include the name of the item, the name of the supplier, the way of contact, the quotation date, and two copies. Otherwise, it will not be accepted.

    Four. The deadline and place to submit the quotation.

    1, deadline for submission: Twenty 20 years July 3rd, 10 hours and 00 minutes.

    2, address: Anhui ag体育 and ag体育 Career Academy tender office, Chizhou Education Park Xueyuan Road No. 9. (by mail, subject to actual receipt time).

    3, unsealed, overdue service or not delivered to the designated place shall not be accepted.

    Five, inquiry procedures and Transaction Principles

    The inquiry team is responsible for unsealing and reviewing all the quotation letters submitted according to the regulations, and determines the suppliers according to the requirements of the quality and service, which are able to meet the substantive requirements stipulated in the inquiry letter and the lowest quoted price, and the supplier's offer is the contract price of the transaction. The same price is quoted, and the supplier is confirmed through spot drawing.

    Six, contact mode

    Contact number: 0566 - 3388300

    Seven. Tender Supervision department

    Anhui ag体育 and ag体育 supervision and audit office, Career Academy. Telephone: Zero 566- Three million three hundred and eighty-eight thousand eight hundred and fifty-eight  

     

     

    Anhui ag体育 and ag体育 Career Academy

    June 30, 2020

     

     

     

     

     

     

     

     

    Quotation letter

    Serial number

    Name

    Requirement (model)

    Number

    Unit Price

    Total price

    One

    Power switch for roof fan control cabinet

    4P 63A switch

    2 sets

     

     

    Two

    Fire shutter door control cabinet (double power supply)

    FJK-SF-XA01 Dual power supply

    3 sets

     

     

    Three

    Dual power transfer switch

    AC400V 50Hz 32A

    1 sets

     

     

    Four

    Laying of power line for fire engine (including bridge frame)

     

    One

     

     

    Five

    Fire alarm main battery (two groups, 4 small batteries)

    Yi AI electric fire, love power monitoring host battery

    2 group

     

     

    Six

    Firefighting equipment power monitoring host, electrical alarm host battery (two sets of 4 small batteries)

    Yi AI electric fire, love power monitoring host battery

    2 group

     

     

    Seven

    Gatekeeper fire linkage main engine double circuit board

     

    1 pieces

     

     

    Eight

    maintenance costs

     

     

     

     

    Aggregate total price

    Capitalization:

    Lowercase: Yuan

     

    Quotation unit: (official seal)

    Legal person (or authorized person) sign:

          year     month

     

    Remarks:

    1. This form is used for opening the bid.

    2. The quotation materials, personnel, maintenance and other costs.

    3. The final tender offer in the form is the offer after the discount, and is used as the basis for evaluation and calibration. Any final tender offer with choice or condition, or multiple quotations will be invalid.